The Build Begins 29 January 2013

IMG_0595At last we have everything in place and the ground work contractors arrived on site 29 February to begin the footings.  We have a 45 page Mitigation Statement which details what we have to do to comply with the terms of the license.  One of the conditions of the license, is that we have to employ an Ecologist licensed for Bats, to attend on the day of the demolition to ensure that the roof tiles are removed carefully so that if the hibernating bat is found it is  dealt with in the proper manner and installed into the bat boxes we have  provided. Further to that, we must not have any stair access to the loft in the garage, and no day light or lighting in the area. When the garage is completed, we have to employ an Ecologist again for this, to report to Natural England that this has been completed. 12 months after that, we have to employ the ecologist again to report as whether the loft space has been used by bats. The total cost for all of this lunacy over one bat will be in the region of £3300.00.

It was necessary to clear an area at the front for delivery access which required a layer of hard core. The original plan was to demolish the existing dwelling first, which would have given us the hard core we needed. As we cant do that we now have to purchase hard core to do the job.

We had some concerns that the ground would be too wet to dig the footings, but fortunately having started its not too bad. Although there is some water it will just require the digging of a sump and a pump to remove the excess water.  When I purchased the site I was told that there was no mains sewage and there was a septic tank. On the first day of exploration we find that we are in fact on mains sewage, which is a great find and will avoid considerable cost for a replacement septic tank which was in the budget.

The first job has been to scrape  away the soil to get the levels right and we now have a huge mound of very useful top soil. The ground was used for farming in years gone by and looks very good stuff and very unlike the usual brown clay usually found. Next we mark out the building. Having done that everything looks as planned and the building sits very well on the site.

Planning

Before we purchased the site, we researched the possibility of applying for permission for a traditional  Rectory style house on the plot.  Considering the existing street scene and surrounding properties, the experts advised us that this should be just a formality and they could not envisage any problem in achieving planning consent in the usual 8 week time span. We submitted our application on 3 February and we were advised by the Local Authority of a decision date of 30 March. After discussions with builders it was decided that the project could well complete by September. A few weeks after we submitted the plans, neighbours raised minor objections which we agreed to address immediately.  Response time from the planning officer was appalling, after repeated telephone calls and messages from our architect we often waited several weeks for replies. In April we were advised that before planning consent could be approved, it would be necessary to instruct an Ecologist to undertake a Bat survey.

PLOT FROM THE REAR

The area is known to be inhabited by Bats and as a protected species it is unlawful to destroy a property inhabited by them. We issued instructions for a survey, thinking that this would just be a formality. Sadly this was not to be the case.  The Ecologist identified a small number of Bat droppings in the loft space of the property. In the report he stated that the findings were insignificant and that in his opinion the droppings were evident of one Bat roosting in the building. Despite his findings being “insignificant” the resulting cost, frustration and delay, would prove to be very significant. Once a roost has been identified in a property, it then becomes necessary to investigate further and identify the species and numbers involved. A license is then required to demolish a property containing a known roost. Standard practice is for 3 emergence surveys spread over several weeks. An emergence survey involves an Ecologist sitting at the property for several hours at dawn or dusk, with an ultrasonic bat detector.   I called the local biological records centre to seek advise and the senior ecologist advised me that in his opinion it was unnecessary to undertake 3 surveys, after all, we knew that the evidence of bats was insignificant so the procedures should take that into account,  but the final decision would rest with Natural England who issue the license to demolish the building containing the roost. Taking his advise, I settled for one emergence survey which confirmed the presence of one bat, and it was then necessary to write a mitigation statement to satisfy the Local Authority that we would be taking the necessary steps to protect any bats found during the demolition. In the statement we agreed to provide bat boxes around the garden plus making the loft space in the new garage accessible for bats. Once the Local Authority had this  statement they finally issued a conditional planning consent on 26 September, 32 weeks after our application was submitted. One of the conditions was that we follow instructions  to be detailed by Natural England with regard to dealing with the bat. Now all that was left to do, was to submit our application for a license to  Natural England for demolition of the property.

VIEW ACROSS ADJACENT FIELDS

Unfortunately this did not prove to be straight forward. After 4 weeks, Natural England replied stating that they did not have sufficient data to issue a license. Bearing in mind that we had one survey which suggested that there was one bat in the loft space of the property to be demolished,  and an emergence survey confirming the presence of one bat, I found this incredulous. They suggested that in the absence of sufficient data, we sent bat droppings from the loft space for DNA analysis to identify the species of bat. Further to this they asked for information regarding how we would maintain the temperature and humidity in the loft space of the new garage in the event that a bat took up residence. Despite my anger at this further request for information I found this hilarious.

The protection of bats law only caters for the worst possible scenario and that is that a nursery roost of several bats is present, and the procedure is based on that premise. As is often the case, the law leaves no room for an intelligent and sensible adaption to accommodate the situation. All concerned in issuing a license cover themselves to leave no doubt that the correct procedure has been followed as laid down by the law, and in our situation where we found one bat of the most common species, we have to follow the guidelines to the letter and suffer the cost and inconvenience incurred.

All things considered, the way in which our planning application was dealt with by the Local Planning office was nothing short of appalling, and what should have been a very straightforward procedure has evolved into a very unpleasant, costly, and frustrating experience. I have no doubt that Local Planning Offices throughout the country are hindering the economy in this way, for no good reason. I wrote to the Prime Minister, The Deputy Prime Minister and the Housing Minister to highlight this issue, and all three forwarded my letter to the Local Government Offices who wrote and suggested that I complain to the Local Council who were causing the problem! – Extraordinary

CLEARING THE SITE

Expecting that we would receive the go ahead from Natural England in the first week of November, I had arranged for the site to be cleared of all the trees and shrubs that were either in the way or overgrown and no longer attractive.

The JCB and Chainsaws arrived on the 30th October and clearing begun in earnest. The 3 man team were on site for 4 days and the JCB made easy work of it.

Unfortunately, the day before the site clearance started, I received the request for further information from English Heritage. This meant a further delay of up to 8 weeks until we received a response from them having answered their queries. We reviewed the plans and realised that the new building would sit just behind the existing building with a metre to spare, but the planning consent stated that permission was given to build the new property following the demolition of the existing. I called the planning officer and discussed this with him and he told me that while he could not sanction the building of the new house until the demolition of the existing had been undertaken he didn’t consider it likely that the council would question this.

With this in mind, we gave Potton the go ahead for the timber frame on the 14th November. Finally………we are making some progress.

 

House Design

The house will be a traditional style with modern features, and will incorporate high levels of insulation, underfloor heating powered by an air source heat pump, a rainwater harvesting system, solar powered hot water and photo voltaic panels.